Sign in
Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms
Journal article   Peer reviewed

Mathematical optimization for earliness/tardiness minimization in a multiple automated guided vehicle manufacturing system via integrated heuristic algorithms

Hamed Fazlollahtabar, Mohammad Saidi-Mehrabad and Jaydeep Balakrishnan
Robotics and autonomous systems, Vol.72, pp.131-138
05/01/2015
Handle:
https://hdl.handle.net/20.500.12741/rep:9571

Abstract

Automated guided vehicle (AGV) Earliness/tardiness Mathematical programming Scheduling

Metrics

4 Record Views

Details