Abstract
The thermal power plant uses the water as the primary source to generate the electricity. Generally, the water contains so many impurities, which can harm the boiler and other equipments. The dissolved gases in water can cause the corrosion on the boiler and other equipments. This project uses some additional equipment before the water move to the boiler. This additional set up removes the all-visible impurities as well as dissolved gases from the water. The overall concept of the project is to set up the power plant in such a way that it will not reduce only the cost but also improve the efficiency of the power plant. The small electro dialysis unit avoids the extra labor cost for maintenance of the boiler. In addition, this project uses SCADA system to provide the artificial intelligence. SCADA system uses various sensors and alarms which can be monitor remotely from the control center.